Planning appeal decision
59 Chalkhill Road, Wembley, HA9 9AU
Planning appeal 3328279 at 59 Chalkhill Road, Wembley, HA9 9AU (London Borough of Brent) was allowed in part (a split decision) on 12 December 2025 by Inspector Berry A, by written representations. The main issue, as the Inspector framed it: Whether the material change of use of the premises to two flats has occurred as a matter of fact.
Material change of use of premises to two flats
- Authority
- London Borough of Brent
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- residential · Change of use
- Inspector
- Berry A
- Postcode
- HA9 9AU
Main issues, as the Inspector framed them
- Whether the material change of use of the premises to two flats has occurred as a matter of fact
What decided it
The photographic evidence from Council inspections and the appellants' own floorplan sketches demonstrated that the premises comprised two self-contained units with separate facilities (kitchens, bathrooms, and independent access), proving the material change of use to two flats had occurred as a matter of fact.
The decision letter
Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.
With an account
What an account adds to this decision


More decisions in London Borough of Brent
The authority’s record since 2016 · every decision in 2025
- Notice upheld30 September 2026335948630 Randall Avenue, London, NW2 7RN
- Planning permission granted25 September 2026337716026 Sidmouth Road, London, NW2 5HJ
- Notice upheld24 September 20263365164Land and Garage, Rear of 21 Ivy Road and Adjacent to 31 Cedar Road, London, NW2 6SN
- Split Decision17 September 2026335746261 Alder Grove, London, NW2 7DE
- Notice varied and upheld16 September 2026336503173A and the Rear Part of 73 Willesden Lane, Kilburn, London, NW6 7RR
The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®