Town Planner Pro
Search appeal decisions

Planning appeal decision

Allowed10 April 20243328482

Houghton House, Sheepy Road, Sibson, Leicestershire, CV13 6LE

the demolition of existing outbuildings, refurbishment of a Grade II listed residential property, erection of three dwellings and associated external landscape works

Authority
Hinckley and Bosworth Borough Council
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Minor Dwellings
Inspector
Boniface M

Main issues, as the Inspector framed them

  • Whether the development would be at risk of flooding or increase the risk of flooding elsewhere, along with the effect on water quality, ecology, foul and surface water functions and pollution

What decided it

The extensive expert evidence demonstrating that the proposed drainage scheme would significantly improve surface water management, combined with the development's preservation and enhancement of the listed building and conservation area character, outweighed local concerns about flooding and other matters.

Plan policies cited: Policy 13 of the Core Strategy (2009), Policy DM7 of the Site Allocations and Development Management Policies Development Plan Document (2016), Policy S6 of the Sheepy Parish Neighbourhood Plan (2022), Policy S7 of the Sheepy Parish Neighbourhood Plan (2022), Policy S8 of the Sheepy Parish Neighbourhood Plan (2022), Policy S15 of the Sheepy Parish Neighbourhood Plan (2022), Policy DM1 of the Site Allocations and Development Management Policies Development Plan Document (2016), Policy DM3 of the Site Allocations and Development Management Policies Development Plan Document (2016), Policy DM6 of the Site Allocations and Development Management Policies Development Plan Document (2016), Policy DM10 of the Site Allocations and Development Management Policies Development Plan Document (2016), Policy DM11 of the Site Allocations and Development Management Policies Development Plan Document (2016), Policy DM12 of the Site Allocations and Development Management Policies Development Plan Document (2016), Policy DM17 of the Site Allocations and Development Management Policies Development Plan Document (2016), Policy DM18 of the Site Allocations and Development Management Policies Development Plan Document (2016)

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.