Planning appeal decision

Notice varied and upheld26 November 20253335674

Land Adjacent to Rivaside, Maltings Road, Battlesbridge, Essex, SS11 7RG

Authority
Chelmsford Borough Council
Appeal type
enforcement · Enforcement Notice
Procedure
Written Representations
Development
caravan-gypsy · Change of use
Inspector
Ghafoor A

Main issues, as the Inspector framed them

  • Whether the matters alleged constitute a breach of planning control (ground c)
  • Whether the steps required by the enforcement notice exceed what is necessary to remedy the breach (ground f)
  • Whether the period of compliance is reasonable (ground g)

What decided it

The material change of use to a residential caravan site is unacceptable in principle and requires full compliance with the enforcement notice, but the compliance period required variation from 3 months to 8 months to be reasonable.

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.