Planning appeal decision
Land Associated With Washdyke Farm to the North of Billingorough Rd, Folkingham, Lincolnshire, NG34 0EZ
Planning appeal 3337544 at Land Associated With Washdyke Farm to the North of Billingorough Rd, Folkingham, Lincolnshire, NG34 0EZ (South Kesteven District Council) was allowed on 23 April 2024 by Inspector Jordan A, following a hearing. The main issue, as the Inspector framed it: Whether the proposal would lead to an unacceptable loss of best and most versatile agricultural land (BMV).
installation of a solar farm comprising ground mounted solar PV panels with a generating capacity of 27 megawatts (MW), including mounting system, inverters, underground cabling, stock proof fencing, CCTV, internal access tracks and associated infrastructure, landscaping and environmental enhancements for a temporary period of 40 years
- Authority
- South Kesteven District Council
- Appeal type
- major · Planning Appeal
- Procedure
- Hearing
- Development
- utilities-energy · Other Major Developments
- Inspector
- Jordan A
- Postcode
- NG34 0EZ
Main issues, as the Inspector framed them
- Whether the proposal would lead to an unacceptable loss of best and most versatile agricultural land (BMV)
- The effects of the proposal on the setting of heritage assets, in particular the site of the Anglo Saxon Nunnery and Medieval Chapel at Stow Green which is a Scheduled Monument
- The visual effects of the proposal, in particular the effects of the proposal on users of public right of way PRoW Thre/2/1 and the character and appearance of the area
- The effects of the proposal on protected species, in particular its effects on breeding habitat for ground nesting birds
- Whether the proposal would conflict with the requirements of Local Plan policy in relation to a demonstration of public support for Solar PV proposals
What decided it
The substantial weight given to the renewable energy benefit of the scheme outweighed the limited and moderate harms identified to agricultural land and rural character.
the identified harm arising from the development would, on balance, be outweighed by the benefits of the scheme, rendering the scheme sustainable when assessed against the Framework as a whole
What the Inspector cited
- Development plan policies
- Policy SP1Policy RE1Policy DE1Policy EN1Policy EN2Policy EN3Policy EN6
- Judgments
- Lullington Solar Park Ltd – High Court Decision – [2004] EWHC 295 (Admin) AC-2023-LON-002550
How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.
See how each was appliedThe decision letter
Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.
With an account
What an account adds to this decision


More decisions in South Kesteven
The authority’s record since 2016 · every decision in 2024
- Allowed13 October 202660134213 Drummond Road, Bourne, PE10 9JF
- Allowed6 October 20266012310Land Off Brambling Walk, Rippingale, Bourne, PE10 0WB
- Dismissed24 September 20266011585Wayside Farm, Lower Road, Hough On The Hill, NG32 2BB
- Allowed10 August 2026600723229-31 Avenue Road, Grantham, NG31 6TH
- Allowed13 July 20266007057Glebe Farm, Land North of Welby Road, East of Ropsley Road in Heydour Parish, Extending West Along the Highways Through Welby to Londonthorpe Parish, Grantham, NG32 3AQ
The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®