Planning appeal decision
Land West of Westbury Road, Warminster, BA12 0AL
Erection of up to 205 no. dwellings, community hub, public open space, access, infrastructure and associated works, with all other matters reserved
- Authority
- Wiltshire Council
- Appeal type
- major · Planning Appeal
- Procedure
- Inquiry
- Development
- residential · Major dwellings
- Inspector
- Parkin A
Main issues, as the Inspector framed them
- The main issue is whether the proposal would be acceptable in terms of flood risk.
What decided it
The failure to undertake the required flood risk sequential test, where built development was shown to lie within flood zones 2/3, meant the proposal posed an unacceptable risk of flooding that outweighed its benefits.
the substantial benefits of housing delivery, affordable housing and community facilities were outweighed by the very substantial weight given to the harm from the unacceptable flood risk, where the sequential test had not been undertaken
Framework references: 11, 174, 175
Plan policies cited: Core Policy 1 (Settlement Strategy), Core Policy 2 (Delivery Strategy), Core Policy 31 (Spatial Strategy: Warminster Community Area), Core Policy 67 (Flood Risk)
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®