Planning appeal decision
51 Lydden Grove, london, SW18 4LJ
Without planning permission and within the last 4 years, the erection of a timber platform and banister rails on the banks of the River Wandle at the property
- Authority
- London Borough of Wandsworth
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- other · Householder developments
- Inspector
- Watson S
Main issues, as the Inspector framed them
- Whether the unauthorised timber platform and banister rails constitute a breach of planning control (ground c)
- Whether enforcement action could be taken at the date the notice was issued, having regard to the 4-year limitation period (ground d)
What decided it
The aerial imagery evidence demonstrating that the platform did not exist within the 4-year limitation period before the enforcement notice was issued, combined with the finding that the structure constitutes development requiring planning permission.
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®