Town Planner Pro
Search appeal decisions

Planning appeal decision

Allowed25 July 20253354742

Bridge Studios, 318-326 Wandsworth Bridge Road, London, SW6 2TZ

the proposal is for the construction of a two-storey upwards extension to the existing building to provide a total of 6 new residential dwellings comprising 2 x 1-bedroom, 2 x 2-bedroom and 2 x 3-bedroom units. External and internal alterations to the existing building are also proposed to facilitate the development

Authority
London Borough of Hammersmith and Fulham
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Minor Dwellings
Inspector
Robbie G

Main issues, as the Inspector framed them

  • The effects of the proposed development upon the living conditions of future occupiers of the proposed development, with particular regard to those of proposed units 1 and 4 in respect of outlook and natural light
  • The attractiveness of the office units to commercial occupiers, with particular regard to daylight and outlook
  • Highway safety
  • The provisions for the storage (and collection) of waste and recycling

What decided it

The appellant's updated Daylight and Sunlight Assessment demonstrating that all habitable rooms in the proposed flats would meet or exceed the relevant BRE and British Standards daylight targets, combined with the provision of terraces and secondary windows providing additional outlook and mitigation for the single-aspect units.

Plan policies cited: London Plan Policy D6, Hammersmith & Fulham Local Plan Policy HO4, Hammersmith & Fulham Local Plan Policy HO11, Hammersmith & Fulham Local Plan Policy E2, Hammersmith & Fulham Local Plan Policy DC4, Hammersmith & Fulham Local Plan Policy T4, London Plan Policy SI1, London Plan Policy T2, London Plan Policy T6, Hammersmith & Fulham Local Plan Policy CC10, Hammersmith & Fulham Local Plan Policy CC7, Hammersmith & Fulham Local Plan Policy CC13, Planning Guidance Supplementary Planning Document WM1, Planning Guidance Supplementary Planning Document WM2, Planning Guidance Supplementary Planning Document WM3, Planning Guidance Supplementary Planning Document WM4, Planning Guidance Supplementary Planning Document WM11

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.