Planning appeal decision
The Paddock, Higher Rads End, Eversholt, MK17 9ED
Without planning permission, the change of use of the site to a builder's yard, which includes the erection of a boundary treatment fence, the installation of a hard surface, and the creation of an access on to the highway
- Authority
- Central Bedfordshire
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- employment-industrial · Change of use
- Inspector
- Preston C
Main issues, as the Inspector framed them
- Whether the matters alleged in the enforcement notice amount to a breach of planning control, specifically whether the vehicular access constitutes a new access or is a continuation of a former field access
- Whether the requirements of the enforcement notice, particularly the removal of fencing and access, are necessary to remedy the breach of planning control
- Whether the period for compliance with the requirements is reasonable
What decided it
The new access is materially different from the former field gate in design and dimensions, constitutes a breach of planning control, and its removal is necessary to remedy that breach.
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®