Town Planner Pro
Search appeal decisions

Planning appeal decision

Notice upheld12 November 20253357167

4 Albuhera Mews, LONDON, NW7 1FQ

without planning permission, the construction of a raised rear patio, a rear outbuilding and a brick boundary wall along the side boundary of the rear of the garden

Authority
London Borough of Barnet
Appeal type
enforcement · Enforcement Notice
Procedure
Written Representations
Development
other · Householder developments
Inspector
Buchanan R

Main issues, as the Inspector framed them

  • Whether the steps required by the enforcement notice are excessive (ground f)
  • Whether the period for compliance is reasonable (ground g)

What decided it

The steps required by the enforcement notice are consistent with remedying the breach of planning control and the 6-month compliance period is reasonable given the typical nature of the domestic works and lack of substantiated evidence of undue hardship.

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.