Town Planner Pro
Search appeal decisions

Planning appeal decision

Allowed19 November 20253360962

Peter Freedbodys Yard, Boulters Lock Island, MAIDENHEAD, SL6 8PE

replacement boatyard workshop, re-siting of jetty, new pathway, docks, and slipway

Authority
Royal Borough of Windsor and Maidenhead
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
employment-industrial · Other minor developments
Inspector
Billings C

Main issues, as the Inspector framed them

  • The effect of the proposed development on biodiversity, in particular regard to the reduction of undeveloped riverbank
  • Whether the proposed development would provide appropriate biodiversity net gain

What decided it

The operational necessity for the boatyard building to be proximate to the river for dock and slipway access, combined with the absence of substantive evidence of ecological harm and the provision of biodiversity enhancements, justified the intrusion into the 8-metre buffer zone on the eastern riverbank.

Plan policies cited: Policy QP4, Policy NR1, Policy NR2

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.