Planning appeal decision

Allowed20 August 20253362344

Land off Buildwas Bank , Telford , TF8 7EH

the erection of a battery energy storage system including access track, CCTV and light poles, car parking spaces, perimeter fencing and gates, and associated infrastructure

Authority
Telford and Wrekin Council
Appeal type
major · Planning Appeal
Procedure
Hearing
Development
utilities-energy · Major general industry/storage/warehousing
Inspector
Hughes L

Main issues, as the Inspector framed them

  • the effect of the proposed development on land stability
  • the effect of the proposed development on the character and appearance of the area, with particular regard to the preservation or enhancement of the Severn Gorge Conservation Area and the Outstanding Universal Value of the Ironbridge Gorge World Heritage Site
  • the level of community participation of the scheme

What decided it

the significant public benefits of renewable/low carbon energy generation and its contribution to net zero outweighed the very limited less-than-substantial heritage harm and the conflict with the development plan as a whole

the significant weight attached to renewable energy, net zero and economic benefits, together with minor biodiversity and drainage benefits, outweighed the less than substantial heritage harm and the conflict with LP Policy BE1 and the development plan as a whole

Framework references: 196, 212, 215, 220, 161, 57

Plan policies cited: Policy BE9, Policy BE1, Policy BE3, Policy BE5, Policy SP3, Policy SP4, Policy ER1

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.