Planning appeal decision
Land off Buildwas Bank , Telford , TF8 7EH
the erection of a battery energy storage system including access track, CCTV and light poles, car parking spaces, perimeter fencing and gates, and associated infrastructure
- Authority
- Telford and Wrekin Council
- Appeal type
- major · Planning Appeal
- Procedure
- Hearing
- Development
- utilities-energy · Major general industry/storage/warehousing
- Inspector
- Hughes L
Main issues, as the Inspector framed them
- the effect of the proposed development on land stability
- the effect of the proposed development on the character and appearance of the area, with particular regard to the preservation or enhancement of the Severn Gorge Conservation Area and the Outstanding Universal Value of the Ironbridge Gorge World Heritage Site
- the level of community participation of the scheme
What decided it
the significant public benefits of renewable/low carbon energy generation and its contribution to net zero outweighed the very limited less-than-substantial heritage harm and the conflict with the development plan as a whole
the significant weight attached to renewable energy, net zero and economic benefits, together with minor biodiversity and drainage benefits, outweighed the less than substantial heritage harm and the conflict with LP Policy BE1 and the development plan as a whole
Framework references: 196, 212, 215, 220, 161, 57
Plan policies cited: Policy BE9, Policy BE1, Policy BE3, Policy BE5, Policy SP3, Policy SP4, Policy ER1