Planning appeal decision

Allowed16 October 20253365652

Land Adj Trewaters Bungalow, South Of Carland Cross, TRISPEN , Cornwall, TR8 5BB

installation of a solar photovoltaic (‘PV’) array/solar farm with a battery energy storage system and associated infrastructure

Authority
Cornwall Council
Appeal type
major · Planning Appeal
Procedure
Hearing
Development
utilities-energy · Major general industry/storage/warehousing
Inspector
Kirby R

Main issues, as the Inspector framed them

  • The main issue in this case is the effect of the proposal on the character and appearance of the area.

What decided it

The significant public benefits of renewable energy generation, grid flexibility and substantial biodiversity net gain were found to outweigh the less than substantial heritage harm and the landscape/character harm identified.

The wider public benefits of the scheme (renewable energy generation, BESS flexibility, substantial biodiversity net gain and moderate economic benefits) were found to outweigh the less than substantial harm to designated heritage assets and the moderate harm to character and appearance, and to outweigh the resulting conflict with the development plan.

Framework references: 187, 135, 161, 165, 198, 201, 168, 57

Plan policies cited: CLP Policy 23, CLP Policy 2, DPD Policy RE1, CLP Policy 21, CLP Policy 22, CLP Policy 12, CLP Policy 16, CLP Policy 24, CLP Policy 27, DPD Policy C1(5), DPD Policy G2, St Erme NDP Policy 9, St Erme NDP Policy 11

Judgments cited: Holborn Studios Ltd v The Council of the London Borough of Hackney [2017] EWHC 2823 (Admin)