Allowed7 April 20263367817

Land adjacent to the A614, Worksop, S80 3PA

construction and operation of a solar farm and battery energy storage system, together with all associated works, equipment, necessary infrastructure and landscaping

Authority
Bassetlaw District Council
Appeal type
major · Planning Appeal
Procedure
Inquiry
Development
utilities-energy · Other Major Developments
Inspector
Heward H

Main issues, as the Inspector framed them

  • The effect of the proposed development upon the special interest of designated heritage assets: Grade I listed Clumber Park Registered Park and Garden, Grade II* listed Drayton Gate, Grade II* listed Gate Piers and Flanking Walls to Normanton Gate, and West Bridge Grade II Listed Building and Scheduled Monument

What decided it

The significant public benefits of renewable energy generation, carbon reduction and grid connection clearly and convincingly outweighed the low levels of less than substantial harm to the setting of the affected heritage assets.

The public benefits (renewable energy, climate change mitigation, national energy security, biodiversity and landscape gains) clearly and convincingly outweighed the identified less than substantial harm to the significance of the heritage assets, and the balance tipped in favour of allowing the appeal.

Framework references: 212, 215, 161

Plan policies cited: Policy ST40, Policy ST41, Policy ST35, Policy ST33, Policy ST8, Policy ST49

Judgments cited: Holborn Studios v Hackney LBC; Bernard Wheatcroft v SoS for the Environment