Planning appeal decision
Wood View, Ravens Lane, NANTWICH, CW5 8PE
‘Without planning permission, the unauthorised material change of use of Land from an equestrian use to a mixed equestrian use and use as a residential caravan site for the stationing of a caravan for residential use shown in the approximate position hatched green on the attached Plan B and associated domestic paraphernalia
- Authority
- Cheshire East
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- caravan-gypsy · Change of use
- Inspector
- Hitchcock R
Main issues, as the Inspector framed them
- Whether the steps required by the enforcement notice exceed what is necessary to remedy the breach of planning control (ground f)
- Whether the period for compliance specified in the notice falls short of what should reasonably be allowed (ground g)
What decided it
The original 6-month compliance period fell short of what was reasonable because it would fall during a school term and cause disproportionate disruption to the children's education, whereas a 9-month period would coincide with the main school break and provide proportionate balance between the appellant's Article 8 rights and the public interest in protecting the countryside.
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®