Planning appeal decision
141 London Road, Kingston Upon Thames, KT2 6NH
Planning appeal 3369621 at 141 London Road, Kingston Upon Thames, KT2 6NH (Royal Borough of Kingston Upon Thames) was dismissed on 18 November 2025 by Inspector Lo S, by written representations. The main issue, as the Inspector framed it: whether or not the appeal site is a suitable location for the proposed development, having regard to the retention of employment land.
the erection of single storey rear extension and internal alterations to existing ground floor commercial unit (Use Class E(a) and B8). Erection of rear extension to first and second floors, loft conversion, rear upwards roof extension, and internal alterations to provide 5nos. flats, with associated cycle parking and refuse storage
- Appeal type
- minor · Planning Appeal
- Procedure
- Written Representations
- Development
- residential · Minor Dwellings
- Inspector
- Lo S
- Postcode
- KT2 6NH
Main issues, as the Inspector framed them
- whether or not the appeal site is a suitable location for the proposed development, having regard to the retention of employment land
- the effect of the proposed development upon the supply of family housing in the borough
- whether or not the proposed development would provide suitable living conditions for future occupiers
- the effect of the proposed development on surface water drainage and flood risk in the area
What decided it
The cumulative harm arising from loss of employment land, inadequate family housing provision, poor living conditions for future residents, and unresolved flood risk and drainage issues, when weighed against the limited housing benefit of five dwellings, significantly and demonstrably outweighs the benefits under the Framework as a whole.
The modest benefits of increased commercial space, sustainable location, and use of previously developed land were substantially outweighed by the very significant harms of employment land loss, inadequate family housing mix, poor living conditions for future occupiers, and unresolved flood risk and drainage issues; although the Council's inability to demonstrate five-year housing land supply engaged the tilted balance under NPPF paragraph 11(d), the adverse impacts significantly and demonstrably outweighed the limited benefit of five new dwellings.
What the Inspector cited
- Development plan policies
- Policy CS 12 Kingston Core Strategy 2012Policy DM 17 Kingston Core Strategy 2012Policy DM 13 Kingston Core Strategy 2012Policy DM 10 Kingston Core Strategy 2012Policy DM 15 Kingston Core Strategy 2012Policy DM 4 Kingston Core Strategy 2012Policy CS 1 Kingston Core Strategy 2012Policy H10 London Plan 2021Policy D3 London Plan 2021Policy D6 London Plan 2021Policy E4 London Plan 2021Policy E7 London Plan 2021Policy SI 13 London Plan 2021Policy Guidance 13 Residential Design SPD 2013
- National Planning Policy Framework
- Paragraph 11
- Judgments
- Holborn Studios Ltd v The Council of the London Borough of Hackney (2018)
How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.
See how each was appliedThe decision letter
Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.
With an account
What an account adds to this decision


More decisions in Royal Borough of Kingston Upon Thames
The authority’s record since 2016 · every decision in 2025
- Dismissed25 September 2026335192311A Berrylands Road , Surbiton , Kingston Upon Thames, KT5 8QX
- Dismissed10 August 2026600860012 Coombe Ridings, Kingston Upon Thames, KT2 7JT
- Allowed2 July 20266007432The Gate House, Coombe Wood Road, Kingston, KT2 7JY
- Allowed29 June 20266005791Sheet Metal Works, 13A Westfield Road, Surbiton, KT6 4EL
- Dismissed27 May 2026600467237 Addison Gardens, Surbiton, KT5 8DJ
The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®