Planning appeal decision
J. W. Stamp & Son Engineering Works, , Holydyke,, Barton-upon-Humber, DN18 5PS
part demolition and conversion of an existing engineering workshop to form seven townhouses, including creation of a new access onto Chapel Lane and associated works
- Authority
- North Lincolnshire Council
- Appeal type
- minor · Planning Appeal
- Procedure
- Written Representations
- Development
- residential · Minor Dwellings
- Inspector
- Love D
Main issues, as the Inspector framed them
- the effect of the proposal on the Non-Designated Heritage Asset (NDHA) known as Stamps Barn and whether it would preserve or enhance the character or appearance of the Barton-upon-Humber Conservation Area (CA)
- the level of information pursuant to secure the preservation by record of the archaeological significance of the historic building and application site
- whether an acceptable Sustainable Drainage System (SuDS) can be delivered as part of the proposals
What decided it
The unacceptable level of harm to the character and appearance of the conservation area caused by the number and treatment of new openings, which would conflict with heritage protection policies that provide a clear reason for refusal under NPPF paragraph 11(d) notwithstanding the absence of a five-year housing land supply.
The less-than-substantial harm to the conservation area and heritage asset was not outweighed by the private benefit of the building's longevity, and the heritage protection policies provided a clear reason for refusal that engaged the exception to the presumption in favour of sustainable development.
Framework references: 11, 182, 218
Plan policies cited: Policy DS1, Policy HE9, Policy CS5, Policy CS6, Policy DS14
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®