Planning appeal decision

Dismissed25 November 20253371001

The Grey Horse, Front Street, Camperdown, Newcastle upon Tyne, NE12 5UT

conversion of pub (A4) into 4no retail units plus 6no apartments (C3) with 8no new build apartments to rear – 4no retail and 14no apartments in total with associated parking. Update to Application No: 20/01572/FUL”

Authority
North Tyneside Council
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Other minor developments
Inspector
Caines A

Main issues, as the Inspector framed them

  • The effect of the development on a designated area of open space, having regard to local policies
  • The effect of the development on the character and appearance of the area, including the effect on the significance of the Grey Horse, a non-designated heritage asset
  • Whether the development would provide its occupiers with acceptable living conditions, having regard to outlook, headroom, noise, servicing and garden space
  • The effect on highway safety, having regard to servicing arrangements
  • The effect on protected species
  • The effect on a designated wildlife corridor and biodiversity
  • Whether sufficient information has been provided to demonstrate that surface water drainage can be appropriately managed
  • Whether the necessary planning obligations have been secured to mitigate the impacts of the development

What decided it

The cumulative effect of substantial harms—loss of designated open space, considerable harm to a non-designated heritage asset, substandard living conditions, unacceptable highway safety risks, inadequate protected species mitigation, and absence of a completed planning obligation—significantly and demonstrably outweighed the moderate benefits of housing delivery, such that the presumption in favour of sustainable development did not apply.

The moderate benefits of delivering 14 dwellings and introducing retail units, in the context of a substantial housing land supply shortfall of 3.37 years, were significantly and demonstrably outweighed by the cumulative substantial harms to heritage, open space, living conditions, highway safety, biodiversity and the absence of mitigation through planning obligations, such that the presumption in favour of sustainable development did not apply and the proposal conflicted with the development plan as a whole.

Framework references: 11, 57, 115, 135, 182, 187, 192, 193, 216

Plan policies cited: Policy DM5.2, Policy DM5.3, Policy DM6.1, Policy DM4.9, Policy DM7.4, Policy DM5.5, Policy DM5.7, Policy DM5.14, Policy S5.4, Policy S7.1, Policy DM4.7, Policy DM5.6