Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed21 January 20263374723

The Oaks, Mill Lane, Bulkeley, MALPAS, Cheshire, SY14 8BL

Authority
Cheshire East
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Minor Dwellings
Inspector
Evans C

Main issues, as the Inspector framed them

  • whether the site represents an appropriate location for housing having regard to local and national policy

What decided it

The significant adverse impacts of the proposal on the housing strategy and reliance on private transport in this unsustainable location significantly and demonstrably outweigh the limited benefits of a single dwelling without affordable housing or secured self-build status.

The presumption in favour of sustainable development under NPPF paragraph 11(d) was engaged due to the lack of 5-year housing land supply, but the significant adverse impacts on housing strategy and reliance on private transport significantly and demonstrably outweighed the limited benefits, so the presumption did not apply.

Framework references: 11

Plan policies cited: Policy PG6, Policy SD1, Policy SD2

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.