Town Planner Pro
Search appeal decisions

Planning appeal decision

Allowed26 March 20266003248

Cairn Farm, Woodland, Bishop Auckland, Durham, DL13 5RH

the installation of one 5kW wind turbine on 12m mast, including concrete foundations and underground cable between tower and house

Authority
Durham County Council
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
utilities-energy · Other minor developments
Inspector
Partington A

Main issues, as the Inspector framed them

  • The effect of the proposed turbine on the character and appearance of the Area of Higher Landscape Value

What decided it

The significant benefits of renewable energy generation and contribution to a sustainable low carbon future clearly outweigh the limited and localised harm to the character and appearance of the Area of Higher Landscape Value.

Plan policies cited: Policy 39, Policy 10, Policy 34, Policy 34e)

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.