Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed31 July 20266006389

Pavement o/s, 22 May Day Green, Barnsley, S70 1SH

installation of a multifunctional communication hub including defibrillator and advertisement display

Authority
Barnsley
Appeal type
Planning
Procedure
Written
Development
telecoms
Postcode
S70 1SH

Main issues, as the Inspector framed them

  • whether the proposal would be acceptable in respect of flood risk
  • the effect of the proposal upon the character and appearance of the area

What decided it

The proposal fails the sequential test for flood risk by locating development in Flood Zone 2 without evidence that sequentially preferable sites are unavailable, contrary to NPPF paragraph 174 and Policy CC3.

Although the proposal would not harm character and appearance and would deliver public benefits through communications infrastructure, the unacceptable flood risk conflict with the development plan outweighed these considerations.

Framework references: 174, 175, 181, 119

Plan policies cited: Policy CC3 of the Barnsley Local Plan, BLP Policies BTC3, BLP Policy D1

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.