Town Planner Pro
Search appeal decisions

Planning appeal decision

Allowed9 August 20213270945

17 The Island, THAMES DITTON, KT7 0SH

replacement of wood framed garden outbuilding chalet

Authority
Elmbridge Borough Council
Appeal type
householder · Householder (HAS)
Procedure
Written Representations
Development
residential · Householder developments
Inspector
Jones R

Main issues, as the Inspector framed them

  • The effect of the outbuilding on flood risk

What decided it

The outbuilding's elevation above recorded and predicted flood levels, combined with its open void design, ensures it would be safe from flooding and would not increase flood risk elsewhere.

Framework references: 168

Plan policies cited: Policy CS26 of the Elmbridge Core Strategy (2011)

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.