Planning appeal decision
Land at 10 Kings Hill, Beech, ALTON, GU34 4AL
without planning permission, the material change of use of the land from agriculture to recreational amenity land
- Authority
- East Hampshire District Council
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- leisure-sport · Change of use
- Inspector
- Hawkins S
Main issues, as the Inspector framed them
- Whether it was too late to take enforcement action against the breach of planning control (ground d)
- Whether the steps required by the notice exceed what is necessary to remedy the breach (ground f)
- Whether the time specified for compliance falls short of what should reasonably be allowed (ground g)
What decided it
The appellants failed to prove on the balance of probability that the unauthorised use had subsisted for ten continuous years, and the gazebo and decking were integral to the unauthorised use and required to be removed to remedy the breach.
Judgments cited: Moore v SSCLG [2012] EWCA Civ 1202; Murfitt v SSE [1980] JPL 598; Somak Travel v SSE & Brent LBC [1987] JPL 630; Newbury DC v SSE & Mallaburn [1994] JPL 879; Welwyn Hatfield BC v SSCLG & Beesley [2011] UKSC 15; Kestrel Hydro v SSCLG & Spelthorne BC [2016] EWCA Civ 784
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®