Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed8 April 20223276941

7 Kramer Mews , London, SW5 9JG

demolition and rebuild of house and creation of a lower ground floor below the original footprint of premises to provide additional residential floorspace

Authority
Royal Borough of Kensington and Chelsea
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Other minor developments
Inspector
Ford C

Main issues, as the Inspector framed them

  • Whether the living conditions of neighbouring residential occupiers, and pedestrian and highway safety, would be adequately safeguarded during the construction of the proposed development

What decided it

The appellant's refusal to agree to the necessary pre-commencement conditions requiring a Construction Traffic Management Plan and Code of Construction Practice compliance meant that living conditions of neighbouring occupiers and pedestrian and highway safety would not be adequately safeguarded during construction.

Plan policies cited: Policy CL7, Policy CL5, Policy CE6

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.