Planning appeal decision

Dismissed30 June 20233286822

Land Between 4 And 5 The Riverbank , Clewer Court Road, Windsor

the construction of one dwelling with associated works

Authority
Royal Borough of Windsor and Maidenhead
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Minor Dwellings
Inspector
Plenty B

Main issues, as the Inspector framed them

  • The effect of the proposed dwelling on the character and appearance of the area, including with regard to the effect on trees
  • The effect of the proposal on the living conditions of occupiers of 4 The Riverbank, with particular respect to outlook, sunlight and daylight
  • Whether the proposal would be within a suitable location for housing with respect to flood risk in consideration of local and national policy

What decided it

The failure to demonstrate that the sequential test had been properly applied to all reasonably available sites in lower flood risk areas, combined with inadequate evidence of safe evacuation routes, meant the proposal conflicted with flood risk policies which could not be outweighed by the modest benefits of housing delivery and self-build provision.

Framework references: 159, 167

Plan policies cited: SP2, QP1, QP3, NR1, NR2, NR3, DES01, Windsor Neighbourhood Plan objective 2