Planning appeal decision
102 Waverley Crescent, ROMFORD, RM3 8AJ
Without planning permission, the construction of side and rear canopies
- Authority
- London Borough of Havering
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- other · Not Applicable
- Inspector
- Douglas L
Main issues, as the Inspector framed them
- Whether the construction of side and rear canopies constituted a breach of planning control (ground c)
- Whether at the date the notice was issued no enforcement action could be taken in respect of the side and rear canopies (ground d)
What decided it
The side canopy along the original house (but not the rear extension) was demonstrated to have been in place for more than four years before the enforcement notice was issued, placing it outside the four-year enforcement period under section 171B of the Act, while the rear and side canopies associated with the rear extension were substantially reconstructed less than four years before the notice.
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®