Town Planner Pro
Search appeal decisions

Planning appeal decision

Planning permission granted10 September 20253342804

Barwell Court Stables (Aka Kingston Riding Centre), Barwell Lane, Chessington, KT9 2LZ

Planning appeal 3342804 at Barwell Court Stables (Aka Kingston Riding Centre), Barwell Lane, Chessington, KT9 2LZ (Royal Borough of Kingston Upon Thames) was allowed on 10 September 2025 by Inspector Jones R, by written representations. The main issue, as the Inspector framed it: whether the developments would amount to inappropriate development in the Green Belt having regard to the Framework and relevant development plan policies.

the erection of a hay/straw barn to serve the existing equestrian use

Appeal type
enforcement · Enforcement Notice
Procedure
Written Representations
Development
leisure-sport · Other minor developments
Inspector
Jones R
Postcode
KT9 2LZ

Main issues, as the Inspector framed them

  • whether the developments would amount to inappropriate development in the Green Belt having regard to the Framework and relevant development plan policies
  • the effect on the openness and purposes of the Green Belt
  • if the developments are inappropriate, whether any harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the developments

What decided it

The very significant weight attached to the community and recreational benefits of the established equestrian facility, particularly its provision of free riding for those with learning disabilities for over 35 years and teaching to disadvantaged children, combined with significant economic benefits through employment and rural business support, clearly outweighed the harm to Green Belt openness and other identified harms.

What the Inspector cited

Development plan policies
London Plan Policy G2CS1 Policy DM5CS Policy CS3CS Policy DM4Policy SB1
National Planning Policy Framework
Paragraph 85Paragraph 87Paragraph 88Paragraph 110Paragraph 115Paragraph 143Paragraph 151Paragraph 153Paragraph 154Paragraph 155

How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.

See how each was applied

The decision letter

Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.

With an account

What an account adds to this decision

86 other decided appeals within two kilometres of this site. In the app every dot opens its decision, and its letter wherever one was published, and you can draw your own site to see what has been decided around it.AllowedDismissedSplitThis decision
An appeal decision in the app, with the main issues, policies and judgments cited picked out beside the letter
Every letter, there to read. We pick out the main issues, the policies and the judgments cited, so you can work through the letter faster.
Searching the full text of appeal decision letters in the app
Search inside every letter. By words or by meaning, filtered by authority, outcome, appeal type and procedure, with every locatable decision on the map and the Inspector named on each.
Start your free trial

More decisions in Royal Borough of Kingston Upon Thames

The authority’s record since 2016 · every decision in 2025

  1. Dismissed25 September 20263351923
    11A Berrylands Road , Surbiton , Kingston Upon Thames, KT5 8QX
  2. Allowed29 June 20266005791
    Sheet Metal Works, 13A Westfield Road, Surbiton, KT6 4EL
  3. Dismissed27 May 20266004672
    37 Addison Gardens, Surbiton, KT5 8DJ
  4. Allowed22 May 20266004895
    Wighill, Old Malden Lane, Worcester Park, London, KT4 7PU
  5. Dismissed12 May 20266002544
    Glanmire Farm, Rushett Lane, Malden Rushett, Chessington, KT18 7TR

The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every appeal around it, with its letter to read and the main issues, policies and judgments cited picked out.