Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed9 June 20253351291

Lazy Otter Marina, Cambridge Road, Stretham, Ely, Cambs, CB6 3FS

Authority
East Cambridgeshire District Council
Appeal type
ldc · Lawful Development Certificate
Procedure
Written Representations
Development
caravan-gypsy · Change of use
Inspector
Merrett R

Main issues, as the Inspector framed them

  • Whether the breach of Condition 7 of the 1983 permission (requiring works to be carried out strictly in accordance with approved layout drawing 83/A/1) has been continuous for the requisite 10-year period to render it lawful development

What decided it

The six-week material break between removal of the previous structure in December 2019 and siting of the current caravan in January 2020 meant the appellant could not demonstrate the continuous breach of Condition 7 for the requisite 10-year period.

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.