Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed19 September 20253365822

Pavement outside no. 18 Osborne Street, Colchester, CO2 7DP

installation of 1No. BT Street Hub Unit and associated advertisement panels on either side of the unit

Authority
Colchester Borough Council
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
utilities-energy · Minor retail and services
Inspector
Fern L

Main issues, as the Inspector framed them

  • The effect of the proposal on the character and appearance/visual amenity of the surrounding area, affording special attention to Colchester Conservation Area No 1 and having regard to 19 Osborne Street as a non-designated heritage asset
  • The effect of the proposal on public safety, with specific regard to pedestrian movement

What decided it

The less than substantial harm to the significance of Colchester Conservation Area No 1 caused by the imposing and incongruous street hub structure outweighed the moderate public benefits of the proposal, requiring dismissal in accordance with paragraph 215 of the NPPF.

Framework references: 215, 216

Plan policies cited: Policy SP7 of the North Essex Authorities' Shared Strategy Section 1 Plan, Policy DM15 of the Colchester Borough Local Plan, Policy DM16 of the Colchester Borough Local Plan, Policy DM20 of the Colchester Borough Local Plan, Policy DM21 of the Colchester Borough Local Plan

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.