Planning appeal decision
Land west of Brook Lane and South of A259, Angmering, Angmering, BN16 3JL
demolition of existing structures on site and the erection of an employment park for Use Class E(g)(ii) and B8 floorspace with ancillary offices and structures, delivering the enabling works phase, public right of way diversion, associated access, reptile re- location, drainage and landscaping scheme, followed by the delivery of each development parcel via severable phases
- Authority
- Arun District Council
- Appeal type
- Planning
- Procedure
- Written
- Development
- employment-industrial
- Postcode
- BN16 3JL
Main issues, as the Inspector framed them
- Whether the proposed development demonstrates compliance with the Sustainable Urban Drainage hierarchy and provides an appropriate surface water compensation area
What decided it
The amended drainage scheme using gravity-fed approach controlled by a hydro-brake, combined with the flood compensation area design that increases overall storage capacity through reprofiling, demonstrated compliance with the sustainable urban drainage hierarchy and appropriate flood risk management, with detailed design matters to be secured by conditions.
Framework references: 14, 58
Plan policies cited: Policy W SP1, Policy W DM2, Policy W DM3
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®