Town Planner Pro
Search appeal decisions

Planning appeal decision

Allowed13 September 20213260962

Wardley Hill Campsite, Wardley Hill Road, Kirby Cane, NR35 2PQ

Planning appeal 3260962 at Wardley Hill Campsite, Wardley Hill Road, Kirby Cane, NR35 2PQ (South Norfolk District Council) was allowed on 13 September 2021 by Inspector Thompson P, by written representations. The main issue, as the Inspector framed it: if, having regard to the development plan, there is a functional need for one or more full-time workers to be readily available at all times for the enterprise and if this need could be met by another dwelling in the area that is available and suitable.

Erection of Managers workplace and Family Ecological Dwelling with associated car parking and extension of campsite total area to South boundary

Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
leisure-sport · Minor Dwellings
Inspector
Thompson P
Postcode
NR35 2PQ

Main issues, as the Inspector framed them

  • if, having regard to the development plan, there is a functional need for one or more full-time workers to be readily available at all times for the enterprise and if this need could be met by another dwelling in the area that is available and suitable
  • the effect of the proposed development on the character and appearance of the site and the surrounding rural landscape

What decided it

The functional need for on-site residential accommodation to manage multiple safety risks (fire, crime, flooding, visitor welfare) could not be met by alternative dwellings available and affordable to the appellants within the locality.

The benefits of providing necessary on-site residential accommodation to ensure safe operation of the campsite and protect visitor welfare outweighed any concerns about introducing residential use in a rural location, as the development accorded with the development plan.

What the Inspector cited

Development plan policies
Policy DM2.11Policy DM3.8Policy DM4.5Policy 1 of the Joint Core Strategy for Broadland, Norwich, and South NorfolkPolicy DM3.10 of the South Norfolk Local Plan Development Management Policies Document

How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.

See how each was applied

The decision letter

Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.

With an account

What an account adds to this decision

5 other decided appeals within two kilometres of this site. In the app every dot opens its decision, and its letter wherever one was published, and you can draw your own site to see what has been decided around it.AllowedDismissedSplitThis decision
An appeal decision in the app, with the main issues, policies and judgments cited picked out beside the letter
Every letter, there to read. We pick out the main issues, the policies and the judgments cited, so you can work through the letter faster.
Searching the full text of appeal decision letters in the app
Search inside every letter. By words or by meaning, filtered by authority, outcome, appeal type and procedure, with every locatable decision on the map and the Inspector named on each.
Start your free trial

More decisions in South Norfolk

The authority’s record since 2016 · every decision in 2021

  1. Dismissed12 October 20266010930
    Land East of Darnell House, Church Lane, Hethel, NR14 8HF
  2. Dismissed29 September 20266008791
    Land West Of The Old Hall, Watton Road, Colney, NR4 7TX
  3. Allowed25 September 20266004780
    Land Off Alburgh Road, Hempnall, Norwich, NR15 2NS
  4. Dismissed24 September 20266010418
    Land South of Darlifields, Heywood Road, Tibenham, NR16 1PB
  5. Dismissed5 August 20266005304
    Land East Of Low Road, Tasburgh, Norwich, NR15 2AR

The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every appeal around it, with its letter to read and the main issues, policies and judgments cited picked out.