Town Planner Pro
Search appeal decisions

Planning appeal decision

Allowed6 November 20243346865

Centre of Pond 52m From Ditchers Farm, Slack Lane 50m From Unnamed Road, Slack Lane, Westhoughton, Bolton, BL5 3LB

the installation and operation of a Battery Energy Storage System (BESS) and ancillary infrastructure

Authority
Bolton Metropolitan Borough Council
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
utilities-energy · Minor general industry/storage/warehousing
Inspector
Hartley S

Main issues, as the Inspector framed them

  • The effect of the proposed development upon the character and appearance of the area including land designated as other protected land (OPL) in the development plan for the area
  • Biodiversity including whether it would deliver biodiversity net gain

What decided it

The national energy supply benefits associated with providing backup electricity to the national grid outweigh any conflict with development plan policy, combined with the site-specific circumstances demonstrating no material harm to character, appearance, or biodiversity.

Framework references: 154, 155, 180

Plan policies cited: Policy CG6AP, Policy JP-G1, Policy JP-G2, Policy JP-G7, Policy JP-G8, Policy JP-S4

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.