Planning appeal decision
Footpath Off Great Cambridge Road, Tottenham, London, N17 7LH
removal of existing BT phone box and installation of a proposed replacement BT Street Hub and associated display of advertisement to both sides of the unit”
- Authority
- London Borough of Haringey
- Appeal type
- minor · Planning Appeal
- Procedure
- Written Representations
- Development
- telecoms · Other minor developments
- Inspector
- Hatfield T
Main issues, as the Inspector framed them
- The effect of the development on the character and appearance of the area
What decided it
The significant visual harm arising from the height, width and luminance of the proposed street hub, which would create a prominent and imposing feature that dominates the streetscape, outweighs the functional and sustainability benefits of the proposal.
Plan policies cited: Policy D3 of the London Plan (2021), Policy SP11 of the Haringey Local Plan (2017), Policy DM1 of the Haringey Development Management DPD (2017)
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®